{"id":293,"date":"2019-10-01T20:44:05","date_gmt":"2019-10-01T20:44:05","guid":{"rendered":"http:\/\/sphereconstructioncorp.com\/?page_id=293"},"modified":"2019-12-11T20:52:29","modified_gmt":"2019-12-11T20:52:29","slug":"financial","status":"publish","type":"page","link":"https:\/\/sphereconstructioncorp.com\/?page_id=293","title":{"rendered":"Financial"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row full_width=&#8221;stretch_row_content_no_spaces&#8221; el_class=&#8221;home-banner-sec&#8221;][vc_column][vc_single_image image=&#8221;1040&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_row_inner disable_element=&#8221;yes&#8221; el_class=&#8221;banner-text&#8221;][vc_column_inner][vc_custom_heading text=&#8221;Your General Contractor&#8221; font_container=&#8221;tag:h3|text_align:left&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_custom_heading text=&#8221;with over 30 years of experience!&#8221; font_container=&#8221;tag:h5|text_align:left&#8221; use_theme_fonts=&#8221;yes&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row el_class=&#8221;project-full-content&#8221;][vc_column][vc_custom_heading text=&#8221;Financial&#8221; font_container=&#8221;tag:h3|text_align:center&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_column_text]<strong>Lakeland Bank Locations<\/strong><\/p>\n<p><strong>Highland Mills<\/strong> \u2013 1400 sf renovation of an existing building that was originally part of the mortgage division into a working bank branch. The renovations included custom teller stations, renovation of existing drive through, custom finished, night deposit, ATM, new mechanical, digital media, visor consoles and exterior upgrades<\/p>\n<p><strong>Milton<\/strong> \u2013 Complete gut and interior\/exterior renovation of a 3100 sf branch location. During construction the branch remained open and functional so phasing and sequencing of construction was critical. The renovations included the office additions, new HVAC unit and relocated the ATM from an outside location to inside the branch. Exterior renovations were made to the parking lot and traffic pattern.<\/p>\n<p><strong>Wanaque<\/strong> \u2013 Interior repairs to the 2600 sf banking branch location consisting of extensive structural floor support, shoring and new floor finishes while the branch remained opened and functional. This required extensive off hour and weekend work to accommodate the owners banking operations be undisturbed.<\/p>\n<p><strong>Oak Ridge Office Expansion<\/strong> \u2013 Total gut and interior fit up of a 5000 sf office. This location is currently under construction. The renovation work includes administrative offices, a 125 KBW natural gas generator, DIRTT demountable partition systems, new mechanical, new HVAC system, new bathrooms, vestibule and costume interior finishes[\/vc_column_text][\/vc_column][\/vc_row][vc_row el_class=&#8221;current-proj-sec&#8221;][vc_column][vc_custom_heading text=&#8221;Our Projects&#8221; font_container=&#8221;tag:h2|text_align:center&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_basic_grid post_type=&#8221;post&#8221; max_items=&#8221;-1&#8243; gap=&#8221;0&#8243; item=&#8221;192&#8243; grid_id=&#8221;vc_gid:1576097519598-d3736aef-8027-1&#8243; taxonomies=&#8221;5&#8243; el_class=&#8221;project-block-con&#8221;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row full_width=&#8221;stretch_row_content_no_spaces&#8221; el_class=&#8221;home-banner-sec&#8221;][vc_column][vc_single_image image=&#8221;1040&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221;][vc_row_inner disable_element=&#8221;yes&#8221; el_class=&#8221;banner-text&#8221;][vc_column_inner][vc_custom_heading text=&#8221;Your General Contractor&#8221; font_container=&#8221;tag:h3|text_align:left&#8221; use_theme_fonts=&#8221;yes&#8221;][vc_custom_heading text=&#8221;with over 30 years of experience!&#8221; font_container=&#8221;tag:h5|text_align:left&#8221; &#8230; <\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-293","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=\/wp\/v2\/pages\/293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=293"}],"version-history":[{"count":5,"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=\/wp\/v2\/pages\/293\/revisions"}],"predecessor-version":[{"id":1264,"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=\/wp\/v2\/pages\/293\/revisions\/1264"}],"wp:attachment":[{"href":"https:\/\/sphereconstructioncorp.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}